Wednesday, May 26, 2010

Wednesday, May 26, 2010

Today was a very productive day, I met with the landscaper and the company measuring (and later installing) the the window coverings. The outside of the was painted,


the cabinets are installed,


the entryway tile is installed,


and the wood flooring is almost all done.

Tuesday, May 25, 2010

Tuesday, May 25, 2010

The Vinyl flooring has been laid and the cabinets are going in
Powder Room

Master Bathroom

Kitchen

Friday, May 21, 2010

Friday, May 21, 2010

They put on the first coat of paint today
Dinning Room/Living Room


Walk-in-Closet


Kitchen


Front Door & Entryway

Thursday, May 20, 2010

They didn't start painting today but the buckets of paint are waiting

Wednesday, May 19, 2010

Wednesday, May 19, 2010

All of the doors have been hung and the railings and shelves have been installed and the molding is being installed today getting ready for the painters tomorrow.


Master Bedroom Walk-in-Closet


Master Bedroom Linen Closet


Kitchen Pantry

Tuesday, May 18, 2010

Monday, May 17, 2010

The workers are finishing the walls and applying texture to the ceilings


The stucco has been applied to the outside of the house

Saturday, May 15, 2010

Friday, May 14, 2010

They leveled the ground around the house. Inside the house are a couple of guys sanding the drywall mud smooth.

Wednesday, May 12, 2010

Wednesday, May 12, 2010

All of the drywall is up.

From the front entry into the living room


From the living room into the kitchen


The bay window in the master bedroom

The back wall of the master bedroom

The master bathroom with oversized shower

The double sink area in the master bathroom

The huge walk-in-closet

The stairway to the basement

The hallway to the laundy room and our offices

The laundry room

Dave's office
The 2nd bathroom

Barb's craft room

Hallway to garage door

The garage

The Gas and Electric meters are in and they are both set to zero.